App Development Cost Calculator
Model the total build cost of your app — pick the scope, platforms, features, and team country, then compare Second Talent against a US in-house team and a US agency side by side.
1. App profile
2. Features to build
Total build cost — side by side
Second Talent
$0
US in-house team
$0
US development agency
$0
Team composition (Second Talent)
Engineering
$0
0 person-weeks · 70% of effort
Product design
$0
0 person-weeks · 15% of effort
Product manager
$0
0 person-weeks · 10% of effort
QA / Test
$0
0 person-weeks · 5% of effort
Build cost
$0
via Second Talent
Timeline
0 weeks
0 months calendar time
Monthly burn
$0
average while building
Upkeep / year
$0
maintenance + iteration
Agent-ready talent at $103K a year less.
Vetted on agentic workflows and matched to your stack before you see a résumé.
120 k USD
Typical MVP build cost with a Second Talent team
450 k USD
Median launch-ready product with a 4–5 person team
40 %
Cost reduction vs equivalent US in-house team
70 %
Cost reduction vs a US development agency
How the build actually unfolds
Every app moves through the same five phases. The calculator above sums the effort in each phase for your selected features and team size.
Discovery + architecture
Scoping sessions, technical spike, system design, and stack selection. Typically 5–10% of total effort. Skipping it is the single biggest reason projects blow past budget.
Design sprint
Wireframes, user flows, design system, and clickable prototypes. Runs in parallel with architecture so engineering can start on week 3 with real screens to implement.
Core build
The bulk of the timeline — auth, data model, primary user flows, and platform integrations. This is where the feature checkboxes above add weeks one by one.
Hardening + QA
Integration testing, load testing, accessibility audit, and security review. Usually 15–20% of total effort — less if QA is embedded from the start.
Launch + iterate
Soft launch, telemetry review, and the first 4–6 weeks of rapid post-launch iteration based on real usage. Often underbudgeted and absorbs 10% of the total build cost.
What actually drives app dev cost
Each of these is a lever the calculator adjusts. They compound, which is why two "similar" apps often differ 3–5× in final cost.
App scope
An MVP is 3 core flows and a database. A launch product is 10+ flows, an admin, and a paid tier. A full product adds analytics, growth loops, and cross-platform parity — 5–8× the effort of an MVP.
Platform choice
Web is cheapest. Cross-platform (React Native / Flutter) adds 25%. Dual native iOS + Android adds 75% because you are effectively building the client twice. Always model this before committing.
Real-time features
Chat, video calls, live sync, and multiplayer are the most expensive features per hour of user value. Each adds infrastructure and 4–10 weeks of engineering time.
Payments + compliance
Stripe + basic subscriptions is ~6 weeks. Add PCI scope, marketplace payouts, tax handling, or regulated industries (health / finance) and payments can become 15–25% of total build cost.
Design fidelity
A template-based UI is 1.0×. A custom design system is 1.15×. Motion-heavy, brand-forward experiences (Linear, Superhuman tier) run 1.3× because every screen is hand-tuned.
Team location
A US agency charges $150–200/hr blended. A Second Talent team in Asia runs at 25–40% of that cost, with equivalent senior engineers — and the dev agency margin disappears into your build instead of theirs.
App development cost FAQ
How accurate are these numbers?
What exactly is a "person-week"?
Why is a US agency so much more expensive?
What about ongoing maintenance?
Is the team dedicated or shared?
Do you handle the entire build or just supply engineers?
What this calculator helps you understand
Practical numbers for planning your budget.
Total build cost across four app scopes, from MVP to enterprise platform
Effort breakdown by role — engineering, design, PM, QA — in person-weeks
Side-by-side cost comparison: Second Talent vs US in-house vs US agency
Calendar timeline, monthly burn rate, and ongoing upkeep per year
Get a real quote in 24 hours.
Send us your role and budget and our team will reply with a tailored estimate plus 6 vetted candidates.
Get Your Quote
